Tenement apartment
A full renovation: new wiring, water and heating, repaired ceilings and lime plaster, restored floors, doors and box windows.
- Time
- 12 to 16 weeks for 80 m²
- Price
- from 2,600 zł per m²
We renovate apartments in Toruń’s old tenement buildings and old houses around the city. You get new wiring, pipes, heating and a bathroom, while the ceilings, floors and doors stay: restored, not thrown out.
Prices include labor and building materials. You choose tiles, fixtures, lamps and furniture yourself and pay for them separately. We give you a fixed price for your apartment after the site visit.
A full renovation: new wiring, water and heating, repaired ceilings and lime plaster, restored floors, doors and box windows.
Drying out the walls, insulation on the inside with vapor-open materials, exposed beams, new plumbing and wiring, and a boiler room.
A slab and waterproofing on the wooden floor structure, walls in tadelakt or stone, and a freestanding tub on a reinforced floor.
Paneled doors, parquet, plasterwork, tiled stoves and box windows. Also on their own, without renovating the whole apartment.
For every project we write down what was left of the old interior. Usually more than the owners expected.
Bydgoskie Przedmieście, Toruń
Old Town, Toruń
Złotoria, Lubicz municipality
After the site visit you get a list like this for your apartment. In turn-of-the-century tenements it usually looks much the same.

One visit, about 2 hours
We measure, check the walls for moisture and the beams for damage, and take photos. Free in Toruń and within 30 km.
2 to 4 weeks
Drawings, the scope of work and a list of what stays. If the building is protected by the monument conservator, we also prepare the application and get the approvals.
Up to a week
One price for the whole scope, broken down by item. It only changes if you change the scope.
Depends on the scope
One site manager from the first day to the last. Every Friday you get photos from the whole week and the plan for the next one.
One day
We check everything together, item by item. You get a 5-year warranty, and we come back for a check-up after the first heating season, because old wood moves.
“Three companies wanted to strip the plaster down to the brick and put up drywall. Strop was the only one that suggested repairing it. The walls breathe, and the apartment no longer smells of damp.”
“Every Friday I got photos and the plan for the next week. I live in Gdańsk, I came to Złotoria three times during the whole renovation, and nothing took me by surprise.”
These are the questions we hear most often in the first conversation. If yours is not here, call: +48 56 000 00 00.
Yes, that is most of our work. We prepare the documentation and the application to the municipal monument conservator in Toruń. Approval usually takes 4 to 8 weeks, and we put it in the schedule from the start.
Not during a full renovation, because there is no water or power for a few weeks. For a bathroom or a floor restoration, yes: we split the work into stages and close off one room at a time.
We do, with an invoice and at the prices we get from wholesalers. You can pick tiles, fixtures and lamps yourself, and if you like, we will go to the showroom with you.
Nothing in Toruń and within 30 km. Farther away it costs 300 zł, which we deduct from the renovation price if we sign a contract.
We run at most four renovations at a time. The next available start date is February 2027. Bathrooms and detail restoration can start sooner.
Tell us what you want to renovate and where. We will call you back within two business days and set up a visit on site.